







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Company in Burbank, CA
ADU construction in Burbank runs $180,000 to $420,000 for a detached unit before permit fees, with garage conversions typically landing between $120,000 and $220,000. Burbank homes skew older than what you find in the newer tracts to the north, and the city’s hillside lots, compact R-1 parcels, and strict hillside development rules change how an ADU gets sited, engineered, and approved. Fielding ADU Builders handles the full scope: detached backyard units, garage conversions, and room additions. Call (361) 315-4177 and Reed Calloway will walk you through what your specific lot allows.
Why Burbank Homes Are Different

Most of Burbank’s housing stock dates from the 1930s through the 1960s, which means shallow lot depths, narrow side yards, and garages that were built for a single car and now sit too close to the property line for a clean conversion. Setback variance (the city’s written permission to build closer to the property line than the standard rule allows) is common on Magnolia Park bungalows and the postwar ranches south of Chandler Boulevard. Hillside neighborhoods above Glenoaks Boulevard carry their own constraints: slope analysis, retaining wall review, and foundation engineering that flat-lot ADUs never touch.
Burbank also runs its own building department, separate from LA County, so plan review times and inspector availability follow Burbank’s schedule, not Los Angeles’s. That cuts both ways. We know which corrections Burbank plan checkers flag most often on ADU submittals, and we build that into the drawings before the city ever sees them.
Our Main Burbank Services
These are the three jobs Burbank homeowners call us about most, and each one has its own page with pricing, process, and what we see on local lots.
Room Addition Contractor in Burbank
Room additions in Burbank usually mean going up or going back. Many of the original homes here don’t have the side yard to add a bedroom at ground level, so we plan the roofline, structural tie-in, and foundation work around what the existing framing can carry. Hillside additions above Glenoaks add retaining and drainage work that flat-lot additions skip. Room Addition Contractor in Burbank covers what a second-story addition or rear bump-out costs here and how we phase the work so you can stay in the house.

Garage Conversion Contractor in Burbank
Burbank garages are often detached and built tight to the rear property line, which makes the conversion itself straightforward but the setbacks the sticking point. We handle the variance paperwork when it’s needed and coordinate with Burbank’s building department on the habitable-space upgrades: insulation, electrical panel capacity, and egress. Garage Conversion Contractor in Burbank explains what a detached versus attached conversion runs and which permit triggers apply.

ADU Builders in Burbank
Backyard ADUs in Burbank fit three patterns: a prefab unit set on a prepared foundation, a conventional stick-built structure, or a garage conversion with its own entrance and kitchen. The right build method depends on your lot width, the slope, and whether the city’s parking replacement rules bite. We work with Abodu and Cover on prefab routes and build conventional ADUs with James Hardie siding when the site calls for it. ADU Builders in Burbank details the full scope and pricing.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Brands We Service in Burbank
We install and service the prefab platforms Burbank homeowners ask about most, including Abodu, Cover, and Dvele, along with conventional builds using James Hardie siding. Parts for these systems are stocked locally or ordered direct from the manufacturer, which keeps most service calls to a single visit. Our brands page lists every platform we work with.
Pricing for ADU Company in Burbank, CA
| Service | Typical range in Burbank |
|---|---|
| Detached ADU (prefab, turnkey) | $180,000 – $260,000 |
| Detached ADU (conventional build) | $280,000 – $420,000 |
| Garage conversion ADU | $120,000 – $220,000 |
| Junior ADU (attached, under 500 sq ft) | $90,000 – $150,000 |
| Second-story room addition | $160,000 – $280,000 |
| Rear bump-out room addition | $110,000 – $200,000 |
| Garage conversion (non-ADU living space) | $80,000 – $150,000 |
| Foundation and site prep only | $25,000 – $55,000 |
What pushes the number higher in Burbank is usually the lot, not the building. Hillside foundations, retaining walls, and setback variances add engineering and plan-check time. Every Fielding ADU Builders project gets a written price before any work starts, so the number you approve on day one is the number on the final invoice.
Neighborhoods We Serve in Burbank
We run ADU, garage conversion, and room addition crews across the full Burbank footprint, from the flats to the hills. Most estimate visits happen within two to three business days, and we schedule the site walk around your work hours rather than asking you to take a day off.
- Magnolia Park
- Rancho Adjacent
- Hillside District (above Glenoaks)
- Chandler Bike Path area
- Toluca Woods
Service Area – Cities Near Burbank
Fielding ADU Builders serves Burbank and the surrounding cities from a Los Angeles-based dispatch office, with all crews licensed for work in LA County. If you’re just outside the city line, we also work in Glendale, CA, North Hollywood, CA, Studio City, CA, and La Canada Flintridge, CA.
Serving Burbank, CA - Our Local Coverage Area
We’re based in the Burbank area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Burbank

Burbank’s building department typically runs four to eight weeks on a standard ADU submittal, though hillside projects take longer because of slope and drainage review. We submit drawings calibrated to Burbank’s plan checker preferences so the first correction letter is short.
Only if your site violates the standard setback or lot coverage rules. Detached garages near the rear property line are the most common trigger. We determine whether a variance is needed during the estimate and handle the paperwork if it is. Call (361) 315-4177 to schedule a free site assessment.
No. The written price you approve before any work starts is the number on the final invoice unless you change the scope. The Garrison Standard covers workmanship defects for 365 days; if something fails, we come back and make it right at no charge.
What happens when you call
- 1A real person answersNo phone trees - talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Burbank Customers Say
"Built a detached ADU behind our house. The builder is a veteran and runs the site like a platoon: schedule posted, crew on time, everything labeled. Finished within a few days of the date."
- Ken W."Room addition over the back patio. Framing is square, windows are tight, and the roofline matches."
- Danny L."Foundation and slab poured on schedule. Crew kept the yard orderly."
- Marian J.



