A quiet residential street with a new ADU behind one of the homes
Downey, CA

ADU Company in Downey - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 20+ years
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A former garage converted into a guest house
A second-story addition with a balcony, matched to the original house
A bedroom and desk inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Company in Downey, CA

Fielding ADU Builders builds permitted ADUs, garage conversions, and room additions in Downey, CA. Most Downey homes sit on flat, rectangular lots in neighborhoods platted between the 1940s and early 1960s, which makes siting and setbacks easier to predict, but many of those lots are smaller than today’s new-construction parcels, so the work usually involves a setback variance or a conversation with the city’s planning counter before framing starts. Reed Calloway leads our Downey work. If you’re weighing a detached ADU against a garage conversion, call (361) 315-4177 and we’ll walk the lot with you and put a written price in your hands.

Call (361) 315-4177

Why Downey Homes Are Different

Downey’s housing stock runs heavily to single-story stucco homes built between the late 1940s and the early 1970s, with garage-forward lots and comparatively tight side setbacks. That matters for ADU work in two ways. First, the typical Downey back lot is long but not wide, so a detached ADU often needs a setback variance (the city’s written permission to build closer to the property line than the standard rule allows). Second, many Downey garages were built to older dimensions and with slab elevations that do not meet current energy and drainage codes, which means a garage conversion often starts with a concrete and grading correction before framing or drywall touches the space. Homes in the neighborhoods north of Firestone Boulevard tend to have deeper rear yards; homes south of Florence Avenue and east of Lakewood Boulevard are more compact, and that changes where a 600-square-foot ADU can actually fit. We measure, we check the zoning, and we tell you plainly what fits and what does not.

Our Main Downey Services

These are the three services Downey homeowners call Fielding about most. Each one has its own Downey page with pricing, timelines, and the specific permit path for that job.

Room Addition Contractor in Downey

A room addition in Downey usually means extending off the back of an existing single-story home or converting a covered patio into conditioned square footage. The work involves foundation and slab matching, roof tie-in into the existing hip or gable, reworking the rear elevation stucco so the new wall does not read as an afterthought, and bringing the electrical and HVAC load calculations to the city for plan check. On a Downey lot, the biggest variable is side and rear setback room, and we verify that during the first site visit. Full details are on our Room Addition Contractor in Downey page.

Room Addition Contractor in Downey

Garage Conversion Contractor in Downey

Downey garages from the 1950s and 1960s often have a slab that pitches toward the alley or the driveway, no insulation, and a roofline that barely clears code for a dwelling unit. That does not mean the conversion cannot work. It means the project typically starts with a slab correction, a new floor assembly, and re-framing the overhead door opening into a proper exterior wall. Downey’s planning department looks carefully at off-street parking requirements when a garage is converted, so we handle the parking replacement conversation as part of the permit package. Detailed pricing is on our Garage Conversion Contractor in Downey page.

Garage Conversion Contractor in Downey

ADU Builders in Downey

As ADU builders, we handle detached backyard units, attached junior units, and garage-to-ADU conversions. Downey’s flat lots are an advantage for prefab platforms like Abodu and Mighty Buildings, because a level site reduces crane and foundation prep time. On tighter lots where a modular unit will not clear the side setback, a stick-built unit with a smaller footprint gets the job done. Every build starts with a written price and ends with a one-year written guarantee under The Garrison Standard. The full breakdown is on our ADU Builders in Downey page.

ADU Builders in Downey
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (361) 315-4177

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Brands We Service in Downey

We build with Abodu, Cover, and Mighty Buildings for Downey homeowners who want a factory-built ADU with faster finish dates, and we do conventional framing with James Hardie siding when the design calls for it. Parts and panels are ordered directly from each manufacturer; no local rep delays. See our brands for the full list and what each platform handles best on a Downey lot.

Pricing for ADU Company in Downey, CA

Service Typical range in Downey
Room addition (stick-built, basic finish) $85,000 – $140,000
Room addition (larger footprint, premium finish) $140,000 – $200,000
Garage conversion to dwelling unit $70,000 – $105,000
Garage conversion with bathroom added $90,000 – $125,000
Detached ADU (prefab, on-level site) $110,000 – $195,000
Detached ADU (stick-built, 450 – 600 sq ft) $125,000 – $210,000
Junior ADU (interior conversion, attached) $80,000 – $130,000
Foundation and slab correction (pre-build) $8,000 – $22,000
Setback variance application and filing $3,500 – $7,500
Site preparation, utility trenching, hookups $9,000 – $25,000

What pushes a Downey price toward the top of those ranges is usually one of three things: a garage slab that needs to be demoed and re-poured, a setback variance that drags through a longer review, or a requested finish level that includes custom cabinetry and higher-end flooring. Whatever the final figure is, it goes in writing before any work starts, and that number is the number on the final invoice. No change orders mid-frame unless you ask for a change.

Neighborhoods We Serve in Downey

We work across Downey, from the older grid streets near Downtown to the quieter blocks south of Imperial Highway. The neighborhoods below are representative of where we are on-site most weeks. Fielding crews typically arrive the same week for estimates anywhere in Downey.

  • Northeast Downey (north of Firestone Boulevard)
  • South Downey (south of Florence Avenue)
  • The Rancho District
  • Downey Landing area
  • West Downey (bordering the Rio Hondo channel)

Service Area – Cities Near Downey

Fielding ADU Builders serves Downey and the surrounding metro area, with crews dispatched from our Los Angeles office. Homeowners in neighboring cities call us for the same written price and one-year guarantee. We serve Bell Gardens, CA, Santa Fe Springs, CA, Paramount, CA, and Bellflower, CA.

Serving Downey, CA - Our Local Coverage Area

We’re based in the Downey area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Downey

A small deck outside a new ADU

Ready to get started? Free estimates · Free in-home estimates response in Downey
Call (361) 315-4177

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Downey Customers Say

★★★★★ 4.9 from 8+ reviews

"Honest feedback on what the lot could fit. Told me up front what would fit on the lot and what the setbacks would allow."

- Rita C.

"Clear price breakdown. Change orders were all in writing."

- Hal P.

"Solid job. Cabinet delivery was a week behind but they worked around it."

- Ben G.

How It Works in Downey

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Downey - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

More ADU services in Downey

Every build below starts the same way: a free site visit and a written price.

Getting started with Fielding

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Written Guarantee on Every Repair

Expires Mar 31, 2027
Free

Free Second Visit if the Repair Fails

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Downey - we'll get back to you fast. No obligation.

By sending this request, you acknowledge our Privacy Policy and consent to receive communications by telephone, text message, or email about your request, including by the independent contractors we may refer it to.

Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch